IMAC Services Explained: Install, Move, Add & Change

NEXUS IMAC Services Explained

IMAC Services Explained: Install, Move, Add & Change

IMAC Services Explained: Install, Move, Add, Change

IMAC services cover four essential IT equipment activities: install, move, add, and change. These involve deploying new devices, relocating existing equipment, expanding hardware, and modifying configurations. Each activity requires preparation, execution, testing, and documentation to maintain operational continuity. Nexus Global Managed Services (Nexus GMS) includes IMAC within its infrastructure deployment services, supporting structured equipment changes across business IT environments. Understanding IMAC helps IT teams coordinate activities, reduce avoidable disruption, and verify successful completion.

What Are IMAC Services?

IMAC services refer to four structured IT activities—installation, relocation, addition, and modification of equipment. These activities allow organisations to introduce, reposition, expand, or update IT assets through documented service requests.

IMAC tasks typically involve identifying affected equipment, confirming technical requirements, completing the requested work, and verifying that devices function correctly. IBM’s IT service classification recognises IMAC as a service category with separate activities. <escape></escape>

What Does IMAC Stand For?

IMAC stands for Install, Move, Add, and Change:

  • Install: Set up and configure IT equipment for operational use.
  • Move: Relocate existing equipment between desks, rooms, or sites.
  • Add: Introduce additional hardware, components, or functionality to an existing setup.
  • Change: Modify or replace existing equipment or configurations according to technical requirements.

What Types of IT Equipment Are Covered by IMAC Services?

IMAC services commonly involve desktops, laptops, monitors, printers, peripherals, network switches, servers, and point-of-sale (POS) devices.

What Does “Install” Mean in IMAC Services?

Installing in IMAC services means setting up new or reassigned IT equipment, completing its physical connections, applying the required configurations, and verifying that the equipment operates correctly.

Installation typically begins by identifying the equipment, confirming site readiness, connecting power and network cables, and applying approved settings. For example, deploying a workstation involves connecting its monitor, keyboard, and network connection before testing access to required business systems.

What Equipment Can Be Installed Through an IMAC Request?

IMAC installation requests can cover desktop computers, laptops, monitors, printers, network switches, servers, and associated peripherals.

How Is an IMAC Installation Verified?

Installation verification confirms that equipment is correctly connected, configured, and operational. Technicians typically check:

  • Power and device startup
  • Network connectivity
  • Required configuration settings
  • Peripheral functionality
  • Equipment identification and completion records

For network equipment, Cisco’s HF6100-64ED installation guide specifies startup diagnostics and port connectivity verification after installation.

What Does Move Mean in IMAC Services?

Moving in IMAC services means disconnecting and relocating existing IT equipment to an approved location, then reconnecting and testing the devices to confirm normal operation.

An IMAC move may involve transferring a workstation between office desks, relocating network equipment, or moving devices to another business site. The British Columbia Government’s IMAC service agreement describes equipment moves involving disconnection, packing, relocation, and reconnection.

What Happens During an IMAC Equipment Move?

Technicians typically follow these steps:

  1. Identify the equipment and record its current location.
  2. Confirm the destination and required connections.
  3. Disconnect cables and prepare equipment for transport.
  4. Relocate the equipment safely.
  5. Reconnect power, network cables, and peripherals.

For example, relocating an employee’s workstation requires transferring the computer, monitor, and connected peripherals to the designated desk.

Nexus Global Managed Services includes equipment relocation within its IMAC and infrastructure deployment services.

What Must Be Checked After Relocating Equipment?

Technicians verify device startup, network connectivity, peripheral functionality, and access to required systems. The equipment’s new location is documented before completing the IMAC request.

What Does Add Mean in IMAC Services?

Adding in IMAC services means expanding an existing IT setup by installing approved hardware, peripherals, or additional components without replacing the equipment’s primary function.

Hardware additions allow organisations to extend device capabilities while retaining existing infrastructure. These activities require compatibility checks, proper installation, and functional verification.

What Components Can Be Added Through IMAC?

IMAC additions can include external monitors, keyboards, storage drives, memory modules (RAM), and network expansion cards.

For example, connecting an additional monitor expands a workstation’s display setup, while installing extra RAM increases its available memory capacity.

How Is a Hardware Addition Tested?

Technicians verify that the added component is compatible, correctly installed, and recognised by the existing system.

For memory upgrades, Dell’s PowerEdge installation guide describes checking installed memory through BIOS settings.

Technicians also confirm peripheral functionality, inspect relevant system information, and document the completed addition.

What Does Change Mean in IMAC Services?

Change in IMAC services means modifying existing IT equipment, components, or approved configurations and verifying that the updated system operates according to technical requirements.

IMAC changes may involve replacing a faulty hardware component, adjusting network settings, or updating an existing device configuration. Technicians should review the current configuration, obtain required approval, implement the modification, and verify the outcome against the approved configuration baseline defined by NIST.

What Types of Equipment Changes Fall Under IMAC?

Common IMAC changes include replacing existing hardware components, modifying network switch settings, changing device configurations, and updating approved equipment parameters.

For example, changing a network switch’s VLAN configuration requires reviewing existing settings, applying authorised modifications, and testing connectivity.

What Is the Difference Between Add and Change in IMAC?

Add expands an existing IT setup, while Change modifies its current state.

For example, installing an additional memory module is an add activity, whereas replacing an existing module may be classified as a change.

Some activities overlap, so organisations should apply their established IMAC classification and approval procedures.

How Does the IMAC Service Process Work?

The IMAC service process follows six steps, from identifying and authorising an equipment request to preparing devices, completing the task, testing functionality, and documenting closure.

Each IMAC activity—Install, Move, Add, or Change—requires clear instructions, accurate equipment identification, and verification against the approved scope. The British Columbia Government’s IMAC service agreement documents operational requirements for equipment installations, relocations, additions, and changes.

What Information Is Required Before an IMAC Task?

An IMAC request should identify the activity type, equipment details, asset number, current location, destination, required configuration, and approval status.

What Happens During and After IMAC Execution?

Technicians typically follow six steps:

  1. Identify the request: Classify the activity as Install, Move, Add, or Change.
  2. Record equipment details: Confirm asset identifiers, locations, and technical requirements.
  3. Obtain approval: Verify authorisation and prepare the necessary equipment and connections.
  4. Execute the task: Install, relocate, expand, or modify equipment according to the approved instructions.
  5. Verify functionality: Test device startup, network connectivity, peripherals, and relevant configurations.
  6. Document closure: Record test results, update asset information, and confirm completion.

What Checks Should Be Completed Before Closing an IMAC Request?

IMAC closure checks confirm that the approved installation, relocation, addition, or modification is complete, the affected equipment functions correctly, and all relevant records are updated.

Before closing an IMAC request, technicians should complete the following checks:

  • Equipment identification: Verify the asset number, model, and serial number.
  • Location verification: Confirm the equipment is installed or relocated to the approved destination.
  • Functional testing: Check device startup, network connectivity, and connected peripherals.
  • Configuration validation: Confirm hardware additions or configuration changes match approved requirements.
  • Documentation: Record test results, updated equipment details, and any outstanding issues.
  • Acceptance: Obtain confirmation from the authorised requestor where required.

What Should the IMAC Completion Record Include?

An IMAC completion record should contain the request ID, equipment identity, final location, configuration changes, test results, technician details, completion date, and acceptance status.

NIST SP 800-171 Rev. 3 supports maintaining accurate system component inventories, while NIST SP 800-128 addresses documenting and validating configuration changes.

What Common Mistakes Can Affect IMAC Activities?

IMAC activities can fail or require rework when equipment is incorrectly identified, destination requirements are overlooked, hardware compatibility is unverified, approvals are missing, or configuration changes remain untested.

The following mistakes can affect Install, Move, Add, and Change activities:

Common Mistake Consequence Prevention
Incorrect equipment identification Wrong device modified or relocated Verify asset ID and serial number.
Unprepared destination Equipment cannot connect or operate. Confirm power, network, and space requirements.
Incompatible hardware addition Component is not recognised Check device specifications and compatibility.
Missing change approval Unauthorised modification Confirm required authorisation
Unverified configuration changes Functional or connectivity issues remain undetected Test changes against approved requirements.

How Can IMAC Execution Errors Be Prevented?

Technicians can reduce IMAC errors by confirming equipment details, checking site readiness, validating component compatibility, and obtaining necessary approvals before execution.

NIST SP 800-128 recommends testing, authorising, and documenting configuration-controlled changes. Similarly, NIST SP 800-171 Rev. 3 addresses equipment inventory accuracy and configuration controls.

Key Takeaways About IMAC Services

IMAC services cover four essential IT equipment activities: install, move, add, and change. Installation involves deploying and configuring equipment. Move relocates existing devices. Add expands hardware or functionality, and Change modifies existing configurations. Each activity requires proper planning, equipment identification, technical execution, and functional testing. Verifying device performance, updating asset records, and documenting completed work help IT teams maintain equipment accuracy, minimise operational disruption, and ensure successful IMAC service delivery.